Project Background: A Scalable Energy Storage Solution for Commercial Facilities

GSL ENERGY, working alongside its Malaysian partner Innovative Machines Sdn Bhd, completed a large-scale battery energy storage installation at a shopping mall in Malaysia in July 2026.

The system consists of two 2.3MWh liquid-cooled battery containers and two 625kW power conversion systems (PCS). Together, the installation delivers 4.6MWh of nominal battery storage and 1.25MW of combined rated conversion power.

Designed for integration with the mall’s electrical infrastructure, this commercial battery energy storage system provides a controllable source of stored electricity. Its primary purpose is to help the facility manage periods of high power demand by coordinating battery charging and discharging with the building’s electricity consumption.

The installation brings together battery modules, bidirectional power conversion, liquid-based thermal management, protective controls and an energy management system within a containerized outdoor configuration.

Project Specifications

ParameterProject Details
Project LocationMalaysia
Installation SiteShopping mall
Project CategoryCommercial and Industrial (C&I) Energy Storage
Total Nominal Battery Capacity4.6MWh
Battery Configuration2 × 2.3MWh liquid-cooled containers
Power Conversion System2 × 625kW PCS
Combined Rated PCS Power1.25MW
Battery TechnologyLithium Iron Phosphate (LiFePO4 / LFP)
Installation FormatOutdoor containerized energy storage
System ConfigurationGrid-connected, subject to site-specific electrical design and protection
Project PartnerInnovative Machines Sdn Bhd
Primary ApplicationPeak demand management

Managing Peak Electricity Demand in a High-Consumption Commercial Building

Shopping malls operate with a combination of continuously running equipment and loads that fluctuate with occupancy and business activity. Air-conditioning systems, escalators, elevators, food outlets, lighting and other commercial facilities can collectively create substantial electricity demand during busy hours.

For this project, the priority is to reduce peak grid demand rather than simply increase the amount of electricity available on site.

The battery system can be configured to charge when operating conditions are favorable and discharge when the mall’s power consumption approaches a defined demand threshold. By supplying part of the building’s instantaneous electrical load, the BESS can help limit the amount of power drawn from the utility grid during selected periods.

The financial impact depends on the local electricity tariff, the facility’s historical load profile, the applicable maximum-demand calculation and the control strategy used by the energy management system. Actual savings must therefore be established through site-specific operating data rather than battery capacity alone.

Coordinated Operation of a 1.25MW / 4.6MWh Battery Storage System

The installation combines two distinct system ratings that serve different purposes.

Energy capacity: 4.6MWh

The battery containers provide a combined nominal energy capacity of 4.6MWh. This figure represents the rated amount of energy stored across the battery system, not the guaranteed AC energy delivered to the building during every discharge cycle.

Conversion power: 1.25MW

Two 625kW power conversion systems manage the transfer of energy between the batteries’ DC circuits and the facility’s AC electrical network. Their combined rated power is 1.25MW, subject to the equipment specifications and configured operating limits.

During normal operation, the battery management system (BMS) monitors battery operating conditions and supports cell-level and system-level protection. The PCS regulates charging and discharging, while the energy management system (EMS) coordinates power commands according to the site’s operating requirements.

This coordinated architecture allows the storage installation to respond to changing electricity demand while respecting battery operating limits and electrical protection requirements.

Liquid-Cooled Battery Containers for Malaysia’s Outdoor Conditions

Malaysia’s tropical climate makes temperature management an important consideration for outdoor battery installations. High ambient temperatures, humidity and changing weather conditions place practical demands on equipment enclosure design, cooling performance and environmental protection.

The project uses two factory-integrated, liquid-cooled battery containers. Liquid cooling helps manage heat generated during battery operation and supports more consistent temperature control across the battery system.

The containerized format consolidates major storage components into a dedicated installation, helping simplify equipment arrangement and on-site integration compared with assembling individual battery components separately.

For long-term operation, the installation must be evaluated against the actual site environment, including ventilation clearances, drainage, corrosion exposure, maintenance access and the specified environmental protection ratings of the equipment. Cooling performance and operating efficiency also depend on ambient conditions, system settings and the facility’s charging and discharging schedule.

A Commercial Energy Storage Reference for Malaysia

This 4.6MWh installation demonstrates how containerized battery storage can be integrated into a commercial building’s electrical infrastructure to support peak demand management.

With 1.25MW of rated PCS power, two liquid-cooled battery containers and coordinated system controls, the project provides a configuration that can be assessed against the electricity consumption patterns of shopping malls and other large commercial facilities.

GSL ENERGY supplies battery energy storage solutions for commercial and industrial applications, with system configurations selected according to project capacity requirements, installation conditions and intended operating functions.

For shopping mall operators, commercial property owners, EPC contractors and energy project developers, the appropriate BESS configuration depends on the required discharge power, usable energy, operating duration, grid connection requirements and expected demand profile.

Looking for a commercial battery energy storage system for a shopping mall, commercial building or industrial facility? Contact GSL ENERGY to discuss C&I BESS configurations, containerized energy storage, liquid-cooled battery systems and OEM/ODM project requirements.

Recommended Products

Explore our energy storage solutions that power projects like this

6.24kWh wall-mounted lithium battery for home solar energy storage

IP65 6kWh Solar Battery | Expandable 12kWh, 18kWh & 24kWh Wall-Mounted Lithium Battery System

Learn More
Bulk pouch battery cells prepared for shipment to battery manufacturers

Wholesale 450Wh/kg Series 3.7V 12–80Ah Solid-State Pouch Battery Cells

Learn More
GSL ENERGY 450Whkg series 6S and 8S solid-state UAV battery packs

450Wh/kg 6S/8S Solid-State UAV Battery Packs | 22.2V/29.6V Drone Battery

Learn More
Inside the GSL BESS-125K241 cabinet showing battery modules and air conditioning unit

125kW 241kWh Air-Cooled Commercial & Industrial BESS | High-Voltage All-in-One Energy Storage System

Learn More

Get a Free Quote

Please complete the form below. Our representative will contact you soon with product details, project suggestions, or quotation support.

Tip: To help us respond faster, please include battery capacity, voltage, installation location, and expected application if available.

Your information will only be used to respond to this inquiry.